Roofing Cost Estimating: Cost Per Square, Labor Rates, and Material Pricing

Roofing bids are priced by the square (100 SF). This 2026 guide breaks down roofing cost per square for every major system, labor rates, insulation pricing, waste factors, tear-off costs, and the markup math that wins bids without eating margin.

1. Installed Cost by System

Roofing cost varies wildly by system. Here is what $/square looks like in 2026 for a new roof (not including tear-off, but including basic flashings and manufacturer warranty).

Low-slope commercial

Steep-slope residential and commercial

Rule of thumb: For a budgetary number on a commercial flat roof, use $8-11 per SF installed including 2-3 inches of polyiso, cover board, 60 mil membrane, and all flashings.

2. Labor Rates

Burdened hourly wages 2026

Prevailing wage adjustments

Federal Davis-Bacon and state prevailing wage projects can require 30-50% higher wages and benefits. Always pull the wage determination for the county and county subclass of the project before bidding.

3. Productivity

Roofing productivity is measured in squares per crew per day. Productivity drops fast on cut-up roofs with lots of penetrations and flashings.

Productivity by system (crew of 5, per 8-hour day)

Man-hours per square

Easier to benchmark. For a rough rule: most commercial membrane work runs 1.5-2.5 man-hours per square, shingles 1.2-2.0 man-hours per square, metal 2.5-4 man-hours per square, tile 4-7 man-hours per square, slate 6-10 man-hours per square.

4. Material Pricing

Membranes (material only, per square)

Shingles (material only, per square)

Metal panels (material only, per square)

Underlayment and accessories

5. Insulation and Cover Board

Polyiso insulation (installed)

Cover boards (installed)

Fasteners and plates

Mechanical fasteners and plates typically run $15-35 per square depending on attachment pattern and code wind zone. Adhered systems trade fasteners for adhesive ($45-90 per square for low-rise foam or bonding adhesive).

6. Tear-Off and Disposal

Tear-off costs

Disposal and dumpster

7. Waste Factors

8. Markup and Benchmarks

Overhead

Roofing contractors run 10-16% overhead depending on scale. Small local firms trend higher (14-18%), large regional firms lower (8-12%). Calculate your own from last year's books.

Profit margins

Benchmarks to sanity-check your bid

Frequently Asked Questions

How much does roofing cost per square in 2026?
Installed roofing costs per square vary by system: asphalt shingles $450-750, 60 mil TPO $700-1,100, 60 mil EPDM $650-1,000, standing-seam metal $1,100-2,200, clay tile $1,400-2,800, and slate $2,200-4,500. These include membrane, underlayment, basic flashings, and labor but not tear-off or insulation.
What is the labor cost for roofing per square?
Labor alone runs $180-350 per square for shingles, $275-450 per square for single-ply membrane (TPO/EPDM/PVC), $400-800 per square for standing-seam metal, and $600-1,200 per square for tile or slate. Prevailing wage public work can add 30-50%. Labor is typically 35-50% of the installed cost.
How much does a roofer make per hour in 2026?
Roofer burdened wages run $42-72 per hour in 2026 for commercial journeyman, and $55-90 per hour for a foreman. Helpers and apprentices run $28-48 per hour. A typical crew is 1 foreman, 3-5 roofers, and 2-3 helpers. Specialty metal roofers or slate craftsmen command 20-40% premium.
What is roofing labor productivity?
Commercial single-ply roofers install 15-25 squares per crew per day on open areas, dropping to 8-15 squares on roofs with heavy penetrations and flashings. Shingle crews install 15-30 squares per day. Metal panel crews do 8-20 squares per day depending on panel length and pitch. Plan 1-2 man-hours per square as a rough guide.
How much does TPO roofing cost installed?
60 mil TPO roofing costs $7.00-11.00 per sq ft installed in 2026 ($700-1,100 per square) for a full system including membrane, 2-3 inch polyiso insulation, cover board, mechanical fasteners, and flashings. Adhered systems run 15-25% more. Add $2-4 per sq ft for 80 mil upgrade and $1-3 per sq ft for enhanced warranty.
How much does roof insulation cost per square?
2-inch polyiso roof insulation runs $130-200 per square installed in 2026. 3-inch runs $185-260 per square. Tapered insulation adds 20-40% over flat. Cover board (1/2 inch HD polyiso or DensDeck) adds $55-85 per square. Expect total insulation and cover board to be $200-400 per square for a commercial flat roof.
What is the cost to tear off an existing roof?
Tear-off costs run $120-250 per square for shingles (1 layer), $180-350 per square for 2 layers, and $150-300 per square for single-ply commercial roofs depending on attachment. Include disposal dumpster ($350-750 per pull) and dump fees. Heavily wet or damaged insulation adds labor and weight-based disposal cost.
How much does metal roofing cost per square?
Standing-seam metal roofing runs $1,100-2,200 per square installed in 2026. 26 gauge Galvalume is at the low end, 24 gauge painted Kynar finishes run middle, and zinc or copper panels hit the top ($2,800-5,500 per square). Add $150-300 per square for complex hip/valley cut-ups and specialty trims.
What waste factor should I use for a roofing bid?
Low-slope membrane: 5-10% waste (seams and detail cuts). Asphalt shingles simple gable: 10-12%. Complex cut-up shingle roof with hips and valleys: 15-20%. Standing-seam metal: 3-5% (panels cut to length). Tile: 12-18%. Slate: 15-20%. Always round up insulation to full board count and membrane to full roll count.
How do you calculate markup on a roofing bid?
Roofing contractors typically carry 10-16% overhead and 8-15% profit, totaling 20-28% markup. Residential reroofs push 25-35% because of volume and risk. Large commercial hard-bid work trims to 12-18%. Use margin formula: price = direct cost / (1 - margin decimal). Add 3-5% contingency on tear-off or historic work.
How much does an architectural shingle roof cost for a house?
A typical 2,500 SF residential roof with architectural laminated shingles costs $12,500-22,500 fully installed in 2026 ($450-750 per square installed, including tear-off, underlayment, drip edge, flashings, and hauling). Premium designer shingles or impact-rated Class 4 products add 25-50% to the price.
How long does a roofing estimate take?
A complete manual roofing estimate for a 50,000 sq ft commercial building takes 12-24 hours (takeoff, tapered layout review, pricing, proposal). AI roofing estimating tools like PILARS compress the takeoff to 30-90 minutes, letting estimators bid 3-5x more work per week while keeping margins tight.

Run Your First Roofing Takeoff Free

No credit card. No setup call. Upload a plan set and see the output in minutes.